Spring Studios, Spring Place
Our mission was to create an open, multifunctional, modern, and exclusive catering and event space for high profile events such as Fashion Week. Extensive hand-worked concrete finishes and precision installation of custom cut over-sized metal and glass doors were some challenges we faced. Complex imported metal ceilings required precision coordination and high levels of relentless quality control management under a tight, commercially driven time frame. Working under intense timelines can complicate the schedule. We had to work 3 shifts a day to execute the project correctly. Streamline was the General Contractor for this project.
Location
Tribeca
Size
15000 Sq. Feet
Designed by
Bluarch Design
Architect
Antonio DiOronzo
Our Role
General Contractor
Why work with us
Flexible Bidding
We can bid your project as the GC / CM or as a sub contractor.
Fast Paced schedules
We can meet all deadlines once agreed upon with desiogn team and ownership.
We meet deadlines
We work overtime and on weekends when the project requires it.
Highest quality finishing
Our team of finishers leave the project at 100% complete everytime.
Owner operated
Our CEO and COO are involved from start to finish on every project we engage in.